Preparation P&IDs, representing equipment, interconnecting pipe work, instrumentation and control loops, can be prepared to the level of details required by the project. P&IDs can include: |
|||||||||
|
Typical level: |
Conceptual |
Front End |
For Review |
Final |
|||||
|
Main process items |
X |
X |
X |
X |
|||||
|
Stream flags |
X |
X |
X |
X |
|||||
|
Main control loops |
X |
X |
X |
X |
|||||
|
Other control loops |
|
X |
X |
X |
|||||
|
Instrumentation |
|
X |
X |
X |
|||||
|
Emergency shut down |
|
X |
X |
X |
|||||
|
Sumps and bunds |
|
X |
X |
X |
|||||
|
Relief devices |
|
X |
X |
X |
|||||
|
Strainers / Filters |
|
X |
X |
X |
|||||
|
Fluid / line coding |
|
X |
X |
X |
|||||
|
Insulation |
|
X |
+ Tracing |
+ Tracing |
|||||
|
Alarms and trips |
|
|
X |
X |
|||||
|
Temporary strainers |
|
|
X |
X |
|||||
|
Piping vents / drains |
|
|
X |
X |
|||||
|
Sampling points |
|
|
X |
X |
|||||
|
Equipment nozzle ID |
|
|
X |
X |
|||||
|
Line falls / slopes |
|
|
X |
X |
|||||
|
Wall/roof penetrations |
|
|
X |
X |
|||||
|
Orifice plates |
|
|
Not sized |
Sized |
|||||
|
Line sizing and reducers |
|
Preliminary except relief streams |
All except relief streams |
All |
|||||
|
Other project specific features may also be included. P&ID
Checking Checking of each P&ID includes ensuring that: q The correct drawing format has been used. q The required level of detail has been provided for that issue (eg preliminary, for review, for detailed design, for construction). q Streams entering or leaving the diagram are accounted for on other diagrams. q Tagging is complete. q Equipment is in agreement with the equipment list and process data sheets. q Piping codes are consistent with the fluid index. q Trace heating and insulation requirements have been met. q There are adequate means of isolation for maintenance of equipment and instruments. Associated
Documentation Other process engineering documents can also be prepared in conjunction with the P&ID. For example: q Instrument list q Alarm and trip schedule q Line list. q Valve list. q Trap list. q Relief device list. q Orifice list. q Process vents list. q Schedule of special items (eg strainers, flash vessels etc). |
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|
|
||||||||